02/28/04 - Picture update (4)
The preliminary backfill started yesterday and as you can see, it is now possible to walk up to the garage. Unfortunately there was a small incident when filling the garage with sand that blew out the side wall. This was due to too much force on one side without an equal force on the other side. This should be repaired shortly so framing can begin.

Feature Update - I successfully created my first QuickTimeVR from pictures taken on 2/14. I wasn't able to get them all to match up, so the transition is a little awkward. Click here to jump to it. Download QuickTime, if needed, from the left.

02/24/04 - Picture update (12)
Today the "I" beams were hoisted into place and work began on the main floor. Not too interesting from above, but from below, you can see the progress.  Things are starting to take shape in the basement.

02/21/04 - Mass picture update (5) (9) (15) (5)
FOUNDATION COMPLETE! This past week, with temperatures in the 40s and 50s, all of the foundation block work was completed. The misplaced window holes along the left side and back are now in place and the fireplace will be built correctly once the first floor is completed. In some of the pictures you may see some holes in the top of the wall, these are called iron pockets and is where the support "I" beams will go. These will be placed on Tuesday and first floor framing can commence after that.

02/14/04 - Picture update (10)
Happy Valentines Day! Stopped by this morning to see the progress made on the foundation. Quite a bit of it is done, including one whole wall, but alas we've already found a mistake. You can see from the left elevation(coming soon) that there were supposed to be a couple windows. A quick call to the builder assured us that it would be taken care of. Probably won't see any more progress until the weather warms up on Tuesday or Wednesday.

02/13/04 - Picture update (5)
Thanks to a balmy 35o yesterday, work on the foundation has begun. As you can see, there are already 7 rows of block in place along the front edge. Interestingly, the corners are made up of special pieces of block and if you look closely in some of the pictures, you can see that all the corners have been started. Also, special pieces with angled edges are used for the angled parts and if you look closely in the 4th picture you can see one sitting atop the wall. With the temperature being in the 30's again today and tomorrow, I'm hoping to see even more progress this weekend.

02/10/04 - Picture update (2)
Concrete block was delivered today and the foundation should start as soon as it warms up a bit.

02/07/04 - Picture and site update (3)
Took a quick drive by the lot today and found the entire subfoundation filled in. Unfortunately it was covered in snow, so I don't know what it's been filled with. More concrete block should be delivered any day now so the main foundation work can continue.

Also updated the site as to keep a consistent navigation menu.

02/01/04 - Picture update (12)
Decided to stop back the next day and see how much dirt was in place and was quite surprised. It looks like most of the subfoundation is filled in, with the driveway needing more. Of course the driveway will need to be raised much higher than it is, but its a good start.